
Renovation Project
3.96
Air changes per Hour

Winning Categories:
Best Kitchen Renovation Over $125,000
Finalist Categories:
Best Residential Renovation
$800,000 and Over
PURPOSE OF RENOVATION AND THE PROJECT’S CHALLENGES
- Clients had recently purchased a poorly maintained, dark, dated mid 1990’s log home in desperate need of a makeover
- Goal was to keep the character of the original log architecture, modernize, brighten up the interior and rejuvenate the tired log structure
- Reduce maintenance of exterior finishes where possible
- Improve the layout and flow of the main living areas
- Create mudroom with dog-wash station from 3rd garage bay
CREATIVE AND EFFICIENT USE OF SPACE (INCLUDING CHANGES TO LAYOUT)
- Glass wall replaced wall between kitchen and stairwell, opening up the space and bringing in light to the dark kitchen area
- Den converted to pantry with doors to dining-room
- Exercise/massage rooms converted to 2 bedrooms with bath and wine room
- Unused 3rd garage bay converted to mud-room with dog-wash
- Master bath reconfigured for improved function and larger shower
COMPATIBILITY OF EXISTING AND/OR NEW MATERIALS AS WELL AS FINISHING DETAILS
- Modern white finishes and refinished logs brighten spaces even on cloudy days
- Beautiful contrast between logs and white finish modernizing the original dark log architecture
- Tile theme repeated in media, baths and pantry
- Wide plank oak floors color match to existing wood-works and match to original flagstone and new tile
- New EnviroShake roof replaced leaking cedar shakes
- New lighting throughout chosen to reflect more traditional mountain log home
- Glass railings with traditional log posts maintain character while improving light and reducing maintenance
- New gas fireplaces replace open wood burners to allow for heat on demand
CONSIDERATIONS IN ACHIEVING ENERGY EFFICIENCY, COMFORT & HEALTH
- New right sized modulating condensing gas boilers for home and drive
- New Mitsubishi high-performance air-source heat pumps for supplemental heat and AC
- All new windows triple glazed
- Radon testing performed before and after work
- All windows and door sealed to improve airtightness
- Air tightness improvement from 9 to 3.96 ACH
CONSTRUCTION DETAILS/TECHNIQUES OF “THIS PROJECT” TO ACHIEVE INDUSTRY BEST PRACTICES
- Logs refinished and re chinked with flexible caulk to improve appearance and airtightness
- Chronically leaky roof was upgraded with plywood sheeting and waterproof membrane before new composite shingles with snow stops installed
SIMILAR PROJECTS WE'VE DONE
Sky Pilot Silver
Angle-down Custom Home Project Award Winning Custom Home Squamish, BC Completed: 2015 Architectural & Interior Design: RDC Design Structural Design: Andrew Grey Engineering Energy Advisor:
View Project
Gates Lake
This lakeside cabin renovation was the first home in BC to qualify for the CHBA National Net Zero Renovations Pilot Program.
View Project

Get In Touch With Us Today
Have questions? Want to get in touch to chat?
We’re available and ready to connect.