Whistler Vision 2010 Net Zero

WHISTLER VISION 2010 NET ZERO HOUSE - PROGRESS UPDATES


The 2010 Net Zero House will be Whistler's first green house designed to produce more energy than it uses 

 


Insulspan SIPS walls on the rise! PDF Print E-mail
Written by Richard   
Monday, 03 August 2009 02:00

Insulspan panels
Insulspan panels waiting to be installed

insulspan panels

Dave Stevenson of Insulspan (on the left) is onsite giving the best of SIP installation advice to the RDC crew. Thanks for your great tips Dave, amazing customer service!

insulspan panels

Insulspan SIP panels are easy to install. Caulking and place each panel from one corner, working around the building perimeter. Each floor takes a day to place and secure. Wall insulation is in each panel, which will reduce labour costs on insulating the walls later.

insulspan panels

Insulspan SIP panels ready for top plate install, then securing to the bottom plates.

insulspan panels

Simon Babin enjoying the view through the living room window opening. All in a day's work. Merci beaucoup Simon.

Insulspan panels

Top floor SIPs ready for the top floor slab completion before being installed.